EVALUASI TEKNIS DAN DIMENSI PENIMBUNAN PADA PRODUCT COAL STOCKPILE DI PT. PESONA KHATULISTIWA NUSANTARA PROVINSI KALIMANTAN TIMUR (TECHNICAL EVALUATION AND DIMENSIONS OF DEPOSIT FOR PRODUCT COAL STOCKPILE AT PT. PESONA KHATULISTIWA NUSANTARA, NORTH KALIMA

  • Rexy Maulana Program Studi S1 Teknik Pertambangan, Fakultas Teknik Universitas Mulawarman, Samarinda
  • Windhu Nugroho Program Studi S1 Teknik Pertambangan, Fakultas Teknik Universitas Mulawarman, Samarinda
  • Henny Magdalena Program Studi S1 Teknik Pertambangan, Fakultas Teknik Universitas Mulawarman, Samarinda
  • Agus Winarno Program Studi S1 Teknik Pertambangan, Fakultas Teknik Universitas Mulawarman, Samarinda
  • Albertus Juvensius Pontus Program Studi S1 Teknik Pertambangan, Fakultas Teknik Universitas Mulawarman, Samarinda

Abstract

As of 2022 PT PKN has set a production target that has increased from the previous year, namely 1.5 million MT in 2021 to 6 million MT. From the plan to increase coal production in 2022, it is necessary to increase coal processing capacity which consists of a temporary storage facility for coal before crushing (ROM Stockpile), a coal size reduction machine (crushing machine), a place for temporarily storing coal after crushing (temporary product). coal stockpile) and coal loading docks to barges. Especially in the location of the temporary stockpile of coal which must be properly studied to support the production plan towards 6 million MT.

Published
2022-11-21
How to Cite
Maulana, R., Nugroho, W., Magdalena, H., Winarno, A., & Pontus, A. J. (2022). EVALUASI TEKNIS DAN DIMENSI PENIMBUNAN PADA PRODUCT COAL STOCKPILE DI PT. PESONA KHATULISTIWA NUSANTARA PROVINSI KALIMANTAN TIMUR (TECHNICAL EVALUATION AND DIMENSIONS OF DEPOSIT FOR PRODUCT COAL STOCKPILE AT PT. PESONA KHATULISTIWA NUSANTARA, NORTH KALIMA. Journal Transformation of Mandalika, E-ISSN: 2745-5882, P-ISSN: 2962-2956 , 3(4), 131-137. Retrieved from https://ojs.cahayamandalika.com/index.php/jtm/article/view/1152